Back >

C. F. Hard Elementary School

Bessemer, AL

In this project a new center building core was constructed to combine four separate school buildings into one functioning school building. New drives and parking areas were added to transform the rear of the existing school into the new front entrance so that the site could be accessed from a more prominent roadway. MBA performed all civil engineering design and consulting for the project, including layout, grading, drainage and utilities. During the project several sections of paving were salvaged, some were overlaid, and other sections were replaced. Decisions to replace or salvage existing pavements were made both during design and during construction. Phase 1 & 2 completed in 2008. The final phase was completed in 2014.