MBA Engineers, Inc.
 
 
 
Birmingham International Airport Modernization
Birmingham, AL

MBA provided the sediment and erosion control design and assisted with ADEM permitting for the 3-1/2 year long project. Due to the Airport’s need to keep existing the terminal and concourse open and proximity to Village Creek (a tier 1 classified waterway), MBA’s design had to be innovative and unique to adhere to ADEM’s rigid policies and fit the Airport’s challenging site. MBA has also worked on 3 other drainage and erosion control projects over the past 5 years in the effort to remediate and stabilize the vast acres maintained by the Birmingham Airport Authority.

Construction Cost:  $160.0 million
Estimated Completion: 2014
AMVAC Chemical Lab
Axis, AL

This project, which consisted of civil site design and survey services, was located in a high security area on DuPont's industrial campus in Mobile County.  

Construction Completed: 2010