|
|
 |
Westin Hotel
Birmingham, AL
300 room, 10-story, 205,000 SF, post-tensioned concrete,
flat plate structure with an elevated pool structure. It is
located adjacent to the Sheraton Hotel. The Westin Hotel
is slated to be the “Cornerstone” of the Marketplace
Entertainment Development. Together the $70.0 Million
Project, which has begun construction, is the first significant
Development in downtown Birmingham in the last several
years and one of the leading projects in the downtown revitalization movement.
Approximate Construction Cost: $35.0 Million
Estimated Completion: 2012
**Fast-Track Project |
|
|
 |
Coosa Pines Federal Credit Union
Chelsea, AL
This project consisted of site design, subdivision of property, utility extensions, design of an access road to serve 3 parcels, Shelby County Highway improvements, and ADEM permitting and inspections.
Construction Completed: 2011 |
|
|
 |
Hardee's Atlanta Highway Montgomery, AL
Provided Civil Engineering Services for this national based restaurant chain.
Construction Completed: 2011 |
|
|
 |
Renaissance Center Gardendale, AL
Provided Civil Engineering for this 9,000sf multi-tenant retail center in Gardendale, AL.
Construction Completed: 2008 |
|
|
|
300 20th Street, North, Suite 100 • Birmingham, AL 35203 • O) 205.323.6385 • F) 205.324.0698
555 Sparkman Drive NW, Suite 804
• Huntsville, AL 35816 • O) 256.864.2542 • F) 256.864.2543
Info@mbasei.com
© 2011 MBA Engineers, Inc. - All Rights Reserved.
|
| |
|